1. The line joining the front and top views of a point is called 
			
		
	
						 
									
						2. The isometric length of the edge of the cube is obtained by 
			
		
	
						 
									
						3. A circle will appear on an isometric drawing as 
			
		
	
						 
									
						4. Perspective projection are mostly used in 
			
		
	
						 
									
						5. The top view of an object is projected on the 
			
		
	
						 
									
						6. Arrange the specific weight of wood(W), cement (C ), steel (S) and Coarse aggregate (A) in the increasing order. 
			
		
	
						 
									
						7. Generally the unit of measurement of partition wall is 
			
		
	
						 
									
						8. Generally, rent of building is 
			
		
	
						 
									
									
									
						11. Work Charge Establishment cost is taken as 
			
		
	
						 
									
						12. What is the cost of plastering of 4 walls of a room with length 10m, breadth 5m and height 2.5m at the rate of Rs. 100 per sq.m? 
			
		
	
						 
									
						13. The Preliminary inspection of the area to be surveyed is known as 
			
		
	
						 
									
						14. What are the advantages of plane table surveying ? 
			
		
	
						 
									
						15 . An operation for determining the relative elevation of different points on the surface of the earth is called 
			
		
	
						 
									
						16. A 20 cm Theodolite means 
			
		
	
						 
									
						17. Which among the following doesnтАЩt indicate the basic calculation of the total station? 
			
		
	
						 
									
						18. The most reliable method of plotting a theodolite traverse, is 
			
		
	
						 
									
						19. Process of becoming outer surface hard without setting inner surface of concrete is called 
			
		
	
						 
									
						20. Good quality cement contains higher percentage of 
			
		
	
						 
									
						21. Amount of pigment in color cement should not be more than 
			
		
	
						 
									
						22. Cast iron contains carbon approximately 
			
		
	
						 
									
						23. All burnt bricks are soaked in water for at least тАжтАжтАжтАж.. before use with cement mortar. 
			
		
	
						 
									
						24. Lime concrete is used in 
			
		
	
						 
									
									
									
						26. Top portion of bar chart gives 
			
		
	
						 
									
						27. Daily work done means 
			
		
	
						 
									
						28. The process of keeping of concrete in position 
			
		
	
						 
									
						29. For ordinary cement, the maximum expansion by Le-chatlier method should be more than 
			
		
	
						 
									
						30. The plinth level is normally provided тАжтАжтАжтАжтАжтАжтАж.above the ground. 
			
		
	
						 
									
						31. Minimum width of tread for public building is 
			
		
	
						 
									
						32. A joint in the masonry normal to the face of the wall is called 
			
		
	
						 
									
						33. When DPC is to be laid over large areas. the material preferred is 
			
		
	
						 
									
						34. The pH value of water fit for drinking, is 
			
		
	
						 
									
						35. Drop manholes are generally provided in sewers for 
			
		
	
						 
									
						36. Water content of sewage is about 
			
		
	
						 
									
						37. In distribution pipes, drain valves are provided at 
			
		
	
						 
									
						38. Which among these is a method of wiring? 
			
		
	
						 
									
						39. In hill roads the side drains arc provided 
			
		
	
						 
									
						40 Which of the following represents hardest grade of bitumen? 
			
		
	
						 
									
						41. In hill road minimum sight distance required is 
			
		
	
						 
									
						42. River training work is done for 
			
		
	
						 
									
						43. Shape of mandatory sign board is 
			
		
	
						 
									
						44. Timber bridge is suitable upto 
			
		
	
						 
									
						45. Span of long span trail bridge is 
			
		
	
						 
									
						46. Pinpoint the correct statement : 
			
		
	
						 
									
						47. Attracting groynes are built 
			
		
	
						 
									
						48. Underground (Sub-surface) source of water is 
			
		
	
						 
									
						49. рдирд┐рдЬрд╛рдорддреА рд╕реЗрд╡рд╛ рдРрдирдЕрдиреБрд╕рд╛рд░ рднрд╡рд┐рд╖реНрдпрдорд╛ рд╕рд░рдХрд╛рд░реА рд╕реЗрд╡рд╛рдХреЛ рдирд┐рдореНрддрд┐ рдЕрдпреЛрдЧреНрдп рдирдард╣рд░рд┐рдиреЗ рдЧрд░реА рд╕реЗрд╡рд╛рдмрд╛рдЯ рд╣рдЯрд╛рдЙрдиреЗ рд╡рд┐рднрд╛рдЧреАрдп рд╕рдЬрд╛рдп рдХрд╕реНрддреЛ рд╕рдЬрд╛рдп рд╣реЛ ? 
			
		
	
						 
									
						35. рдЧрд╛рдЙрдБрдкрд╛рд▓рд┐рдХрд╛/ рдирдЧрд░рдкрд╛рд▓рд┐рдХрд╛рдХреЛ рдкреНрд░рддреНрдпреЗрдХ рдЖрд░реНрдерд┐рдХ рд╡рд░реНрд╖рдХреЛ рдмрдЬреЗрдЯ рдкреЗрд╢ рдХрд╣рд┐рд▓реЗ рд╕рдореНрдо рдЧрд░реНрдиреБ рдкрд░реНрдЫ ?