1. Built up drawing is normally constructed for the work of:
2. Structural working drawing illustrates
3. In architectural drawing all latters should be uniform is:
4. The size of A3 paper is
5. The surface area of ........drawing sheet is one square meter
6. The large size of drawing board (as per ISI) is designated by
7. The rate of an item of works depends on
8. The unit of measurement of Brick work is in
9. The unit of measurements of Skriting is in
10. The weight of an item measured correct to nearest
11. The center line methods is specially adopted for
12. The necessary elements of the estimate are:
13. Contours of different elevations may cross each other in the case of
14. Determining the difference in elevation between two points on the surface of the earth, is known as
15. The line of collimation method of reduction of levels, does not provide check on
16. The chord of a curve less than peg interval, is known as
17. Principle of surveying is to prevent accumulations of errors is
18. A well conditional triangle has no angle less than
19. The rock formed by gradual deposition, are called
20. Final setting time of quick setting cement is,
21. Gneiss is obtained from
22. Galvanising means covering iron with a thin coat of
23. Good quality stone must
24. For filling cracks in masonry structures, the type of bitumen used, is
25. The strengths of cement is reduced by ...... after 24 months
26. The initial setting time of hydraulic lime, is
28. Generally wooden moulds are made from
30. In stone masonry, stones (startified rocks) are so placed that the direction of pressure to the plane of bedding is
31. Workability improved by adding
32. The commonly used materials in the manufacture of cement is
33. For the construction of cement concrete floor, the maximum permissible size of aggregate, is
34. Slump test is done for
35. Canal used to drain of water from water logged area is
36. Canal taking off from a river with or without head regulator, is called
37. In concrete canal the approximate permissible velocity of water should not exceed
38. The minimum value of camber provided for thin bituminous surface hill roads, is
40. If the cross slope of a country is 25 % to 60 %, the terrain is classified as
41. The types of curves generally provided on highway is
42. The volume of Fine aggregate required to make 10 m3 of 1:2:4 concrete is
43. The main objective of water supply is
44. Manholes along the mains from the source to a city are interval provided at 500 m intervals
45. Water supply includes
46. The portion of a brick cut across the width, is called
47. The brick laid with its breadth parallel to the face of a wall, is known as
48. рдиреЗрдкрд╛рд▓рдорд╛ рдкрд╣рд┐рд▓реЛ рдкрдЯрдХ рдирд┐рдЬрд╛рдорддрд┐ рд╕реЗрд╡рд╛ рдРрди рдХрд╣рд┐рд▓реЗ рдЬрд╛рд░реА рднрдПрдХреЛ рдерд┐рдпреЛ ред
49. рдирд┐рдЬрд╛рдорддреА рд╕реЗрд╡рд╛ рдРрди, 2049 рдорд╛ рдХрддрд┐ рдкрд░рд┐рдЪреНрдЫреЗрдж рд░ рджрдлрд╛ рдЫрдиреН ?
50. Minimum design speed for district road in terai according to NRRS2071 is