1. The text height for room names should be set to ......... for a drawing that will be plottedto a scale of 1/4" - 1'-0",

2. In Engineering Drawing, space between two sentences should be left equal

3. The point of intersection of co-ordinate axis is called

4. Set squares are not used to draw

5. Generally, the units used on an architectural drawing are set to

6. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

7. The unit of measurement for 10 cm thick brick wall is

8. Compute the amount of cement required for 10 m3 RCC having M20 (1:1.5:3

9. The volume of cement required to prepare 100 cubic meter of 1:2:4 concrete is

10. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

11. рдирдпрд╛рдБ рдирд┐рдпреБрдХреНрддрд┐ рд╣реБрдиреЗ рдирд┐рдЬрд╛рдорддреА рдХрд░реНрдордЪрд╛рд░реАрд▓реЗ рдирд┐рдпреБрдХреНрддрд┐ рднрдПрдХреЛ рдХрддрд┐ рджрд┐рдирднрд┐рддреНрд░ рдЖрдлреНрдиреЛ рд╕рдореНрдкрддреНрддрд┐ рд╡рд┐рд╡рд░рдгрдкреЗрд╢ рдЧреБрд░реНрдирдкрд░реНрдЫ ?

12. The 'fix' of a plane table station with three known points, is bad if the plane table stationlies

13. The smaller horizontal angle between the true meridian and a survey line, is known

14. Closed contours of decreasing values towards their centre, represent

15. The bearings of the lines AB and BC are 146┬░ 30' and 68┬░ 30'. The included angle ABC is

16. The rock generally used for roofing, is

17. The objective of surveying is to prepare

18. A plumb line is

19. Tellourometer uses

20. The most weather resisting metamorphic rock is

21. During production of cement raw materials are mixed in

22. If P is the percentage of water required for normal consistency, water to be added for determination of initial setting time is,

23. In the sieve analysis of fineness test, the residue on IS sieve no 9 after 15 minutes of sieving should not be more than

24. Pug mill in used for

25. The following elements of a paint is used as base, pigment, as well as drier

26. During compressive strength load is applied at the rate of

27. Normally the wood used for scaffolding is

28. Teak wood is suitable for

29. The shape of the bull trench kiln is

30. A grillage foundation

31. Residual soils are formed by

32. In cold water curing should be contained for......days

33. The size of fine aggregate does not exceed

34. The maximum buckling factor for sand is

35. Which types of power supply system is needed if small amount of power is required?

36. The devices installed for drawing water from the sources are called

37. Cement concrete floor is laid in a ratio of:

38. Local road are responsibility of

39. Which of the following is not the type of cross drain

40. рдирд┐рдЬрд╛рдорддреА рд╕реЗрд╡рд╛ рдРрди, 2049 рдорд╛ рдХрддрд┐ рдкрд░рд┐рдЪреНрдЫреЗрдж рд░ рджрдлрд╛ рдЫрдиреН ?

41. The tender is:

42. Culvert is most in

43. First structures in the irrigation work is

44. In hilly area with rock exposed, generally the most suitable canal type is

45. Cross slope of road (camber) is

46. The Valve used for precisely adjusting the volume of flow is called

47. The first stage of construction is

48. The bearing capacity of a soil

49. Quarry sap is found in

50. The lower water- cement ratio in concrete products