1. When the angular and linear measurements are equally precise in traversing, the balancing of traverse is done by:

2. The main principal of surveying is to work from

3. Distance between two stations A and B is 200 m whereas their difference in elevation is 2 m. Hence horizontal distance between A and B is

4. If the R.L. of a B.M. is 100 meter, the back sight is 1.215 meter & the foresight is 1.870 meter the reduced level of the forward station is

5. Brass is an alloy of

6. The main ingredients of Portland cement are

7. The size of machine made brick in Nepal is

8. Excess alumina in brick earth causes the brick

10. In a cantilever beam of length (L) and carrying UDL of W per unit length over its entire length, the bending moment at the support is numerically equal to

11. Effect of a force on a body depends upon its

12. Maximum bending moment will occur at point where

13. In the most general form of bernoulli's equation P/w + v2/2g +z=constant each term represents

14. The discharge through a pipe with cross-sectional area A and velocity of flow V is calculated by formula

15. The hydraulic grade line (HGL) always slopes down along the direction of flow because of

16. The rise of water table, which takes place due to the transformation of the unstable shooting flow (Super-critical) to the stable streaming is called

17. The most cohesive soil is

18. Ratio of total volume of voids to total volume of solids in a soil mass is named as:

19. Clay can be classified as

20. The property of the soil which allows to flow water in the soil is known as

21. The shape of shear stress diagram for a reinforced concrete section looks like

22. The nominal cover to be provided in a slab is

23. An RCC column is treated as long if its slenderness ratio is greater than

24. Struts are load carrying members of a frame structure subjected to

25. Slump test is a measure of

26. A type of bond in brick masonry in which each course consists of o alternate headers and stretchers is called.

27. Raft foundation is provided in case total area of all foundation exceeds .... percentage of plan area:

28. The increase in volume of dry sand when water is added is called

29. The maximum floor to floor height of building shall not exceed………. the wall thickness at superstructure

30. Pathogenic bacteria can be removed by water purification process called

31. Which one is water born disease?

32. The sewage treatment in septic tanks is due to

33. To determine the velocity of flow of underground water, the most commonly used none empirical formula is

34. Ratio of the water delivered in to the fields from the outlet point of the channel, to the water pumped into the channel at the starting point is termed as the efficiency of

35. Garrets diagrams are based on

36. For one hectare of land relationship between duty (D), Delta (∆) and base period (B) is give by

37. According to Khosla’s theory, the exit gradient

38. Economical Height of dam is

39. Karnali bridge at E-W highway is a .... ......... type of bridge

40. which road classification is not categorized in Nepal road standard

41. Penetration test of bitumen is carried out to determine:

42. If the stopping sight distance is 60m. Then the minimum stopping sight distance for two lanes, two-way traffic is:

43. The measurement is not made in square meters in case of:

44. In the rate analysis norms prepared by GON

45. The tools and plants cost generally taken to calculate the total cost of earthwork excavation is

46. Original cost of property minus depreciation is

47. Tunnel construction in Nepal is treated as

48. The bar chart is also known as

49. Amount of security money deposited by contractor is

50. The technique for establishing and maintaining priorities among the various jobs of a project, is known

51. नेपालमा पहिलो पटक निजामति सेवा ऐन कहिले जारी भएको थियो ।

52. भवन निर्माणगर्ने अनुमतिको लागि निबेदन परेको कति दिन भित्र प्रमुख प्रससिकीय अधिकृत कारवाही गरिसक्नुपर्छ

53. स्थानीय सरकार संचालन ऐन २०७४ को अनुसार कुन दफामा नक्सा हेरफेर गर्ने व्यवस्था उल्लेखित गरिएको छ

54.सुदूरपश्चिम प्रदेश सुशासन ऐन, २०७५,आनुसार "प्रशासनिक कार्य सम्पादन गर्दा अपनाउनु पर्ने कार्यविधि" परिच्छेद आन्तरगर्त पर्दछ?